Boat Interior Wrap - The “Blakely” Project
Trident Management Group LLC hired RMwraps in the summer of 2020 to help with the refurbishment of the interior of a work boat in Larose, Louisiana. Overall it took Randy 12 days to prep and wrap all of the surfaces you see in the photos and videos below, using about 3.5 rolls of material.
This project had the added step of using architectural films on the horizontal surfaces (counter top, tables) in the galley and saloon as well. After the vinyl was applied to the horizontal surfaces, Randy coated the vinyl with a two-part high-gloss epoxy resin to seal and protect the vinyl from wear and tear.
The Best Way To Wrap A Wall with an Architectural Film Video.
How to wrap a Door frame and Door with Architectural Film Video.
Cabins - Before & After
Galley - Progress Pics
Saloon - Progress Pics
Head - Before & After
Walk-through interior boat wrap using the architectural films Video.
Learn More About Architectural Film Installs
Have a project like this in mind?